# Glossary of Dutch sunlight and building terms

> What do sun hour, reference day, TNO norm, eaves height, building plot, zienswijze and objection period mean? Short explanations of the Dutch terms around sunlight and building.

Canonical: https://schaduwplan.nl/en/begrippen/
Last updated: 2026-11-17

Glossary

## Dutch terms around sunlight and building.

A building plan next door brings words from three fields: the sun, the building rules and administrative law. Each term is explained here in one or two sentences, for most terms with a link to the page that goes further.

## Sun and norms

What is measured and what the result is tested against.

**Bezonning (sunlight)**

The number of hours of direct sun on a measurement point, such as a window, a facade or a garden. In the Netherlands it is usually tested against the TNO norm, a guideline and not a law. [Sunlight, daylight and neighbour law](https://schaduwplan.nl/en/blog/bezonning-daglicht-burenrecht-regels-zonlicht/#sun-exposure)

**Bezonningsstudie (sunlight study)**

A calculation in a 3D model of how many hours of direct sun a window, facade, garden or terrace gets, before and after a building plan. [Make a sunlight study yourself](https://schaduwplan.nl/en/bezonningsstudie/)

**Bezonningsonderzoek (sunlight report)**

The same calculation as a bezonningsstudie. The word is mostly used for the formal report that goes with a permit application, a zienswijze or an objection. [The formal sunlight report](https://schaduwplan.nl/en/bezonningsonderzoek/)

**Schaduwstudie (shadow study)**

The same calculation seen from the other side: where the shadow falls instead of where the sun reaches.

**Bezonningsdiagram (shadow diagram)**

The drawing in a sunlight study that shows where the shadow falls, per reference day and time of day.

**TNO norm**

A Dutch guideline from TNO report 2005-BBE-R0036 for the minimum of direct sun on a home, in a light and a strict variant. It is not in the law, but the Council of State ruled in 2023 that using it as a test framework is not unusual. [The TNO norm explained](https://schaduwplan.nl/en/blog/tno-bezonningsnorm-uitgelegd/#what-is-the-tno-standard)

**Light TNO norm**

At least 2 sun hours a day between 19 February and 21 October, counted from sunrise to sunset. The calculation uses the worst days of that period: 19 February and 21 October. [Light and strict norm side by side](https://schaduwplan.nl/en/blog/tno-bezonningsnorm-uitgelegd/#light-vs-strict-standard)

**Strict TNO norm**

At least 3 sun hours a day between 21 January and 22 November. Because the period runs further into winter, when the sun is low, this norm is harder to meet. [Light and strict norm side by side](https://schaduwplan.nl/en/blog/tno-bezonningsnorm-uitgelegd/#light-vs-strict-standard)

**The Hague norm**

The norm of The Hague since 2011: at least 2 sun hours on 19 February and 21 October, measured at the middle of the facade, with sun counted only from 10° above the horizon. A roof addition may reduce the sunlight of neighbouring homes by at most 50%. [The sunlight norm of The Hague (in Dutch)](https://schaduwplan.nl/bezonningsnorm/den-haag/)

**Rotterdam norm**

Rotterdam tests in three steps whether a measurement point keeps at least 2 sun hours on 21 September. If it drops below that but the loss is under 15%, the plan can go ahead; with a larger loss the municipality weighs the case. [The sunlight norm of Rotterdam (in Dutch)](https://schaduwplan.nl/bezonningsnorm/rotterdam/)

**Municipal sunlight norm**

Under the Environment and Planning Act each municipality chooses its own framework in its omgevingsplan. The Hague, Rotterdam and Eindhoven have their own norm, which Schaduwplan calculates; most other municipalities follow the TNO norm. [The norm of every municipality (in Dutch)](https://schaduwplan.nl/bezonningsnormen/)

**Referentiedag (reference day)**

A fixed day of the year on which the sun hours are calculated, also called peildag. The light TNO norm uses 19 February and 21 October, the strict one 21 January and 22 November; a municipality can choose other days, such as 21 September in Rotterdam. [Which days count](https://schaduwplan.nl/en/blog/tno-bezonningsnorm-uitgelegd/#test-dates)

**Zonuur (sun hour)**

An hour of direct sun on a measurement point, added up over the day. Schaduwplan counts the sunny minutes of a day by sending a ray from the point towards the sun at each step: if it crosses a building or the terrain, the point is in shadow at that moment. [The calculation method](https://schaduwplan.nl/en/bronnen/)

**Daglicht (daylight)**

The amount of daylight a habitable room receives, also when the sun is not shining. Unlike sunlight, daylight is a legal requirement: in the Besluit bouwwerken leefomgeving, calculated to NEN 2057. [Daylight and the law](https://schaduwplan.nl/en/blog/bezonning-daglicht-burenrecht-regels-zonlicht/#daylight)

**VSC (Vertical Sky Component)**

A measure of how much sky the middle of a window still sees from the outside. Schaduwplan shows it as an extra indication; it is not the legal daylight requirement of NEN 2057. [How the court measures daylight](https://schaduwplan.nl/en/blog/bezonning-daglicht-burenrecht-regels-zonlicht/#how-courts-measure-daylight)

## Measuring in the model

Where in the 3D model the sun hours are counted.

**Meetpunt (measurement point)**

The point where the sun hours are counted: a window, a room or a spot in the garden or on a terrace. The report gives the sun hours per point before and after the building plan. [Where the norm measures](https://schaduwplan.nl/en/blog/tno-bezonningsnorm-uitgelegd/#measurement-method)

**Window as a measurement point**

A window is measured at the middle of the window sill, the conservative choice of the TNO method. A roof window is measured at the middle of the glass. [The measuring method](https://schaduwplan.nl/en/blog/tno-bezonningsnorm-uitgelegd/#measurement-method)

**Room as a measurement point**

A room with more than one window, such as a corner room, counts as one measurement point. A moment counts as sun as soon as at least one of its windows gets direct sun. [Rooms with several windows](https://schaduwplan.nl/en/blog/bezonning-daglicht-burenrecht-regels-zonlicht/#multiple-windows)

## Data

The open government data the model is built from.

**3DBAG**

An open 3D model of every BAG building in the Netherlands, by TU Delft and 3DGI, made from AHN laser scans. It gives each building its eaves and ridge heights, its roof type and its roof shape. [Which data Schaduwplan uses](https://schaduwplan.nl/en/blog/welke-data-schaduwplan-3dbag-ahn4-bag/#3dbag-building-models)

**BAG-pand (BAG building)**

A building as recorded in the Basisregistratie Adressen en Gebouwen (BAG), the official register of every building and address in the Netherlands. Each building has its own code, a construction year and an outline on the map. [The BAG explained](https://schaduwplan.nl/en/blog/welke-data-schaduwplan-3dbag-ahn4-bag/#bag-register)

**AHN**

The Actueel Hoogtebestand Nederland: laser scans from an aircraft that measure the height of the whole country, to a precision of a few centimetres. AHN4 was recorded in 2020 to 2022; AHN5 followed from 2023 and AHN6 has been released in parts since October 2025. [When will my home be measured?](https://schaduwplan.nl/en/blog/wat-is-ahn-wanneer-wordt-mijn-woning-ingemeten/#what-is-ahn)

**Report id**

The number at the bottom of every Schaduwplan PDF, in the form SP-XXXX-XXXX-XXXX. With that number or the file itself anyone can check on /verify that the report is genuine and was not changed afterwards. [Verify a report](https://schaduwplan.nl/en/blog/bezonningsrapport-verifieren/#what-verifying-means)

## Building and rules

The measures and plans that decide what may be built.

**Goothoogte (eaves height)**

The height to the top of the wall, where the roof starts. The omgevingsplan often sets a maximum eaves height. [Eaves, building height and plot](https://schaduwplan.nl/en/blog/toegestaan-volume-omgevingsplan/#what-is-the-permitted-volume)

**Bouwhoogte (building height)**

The highest point of a structure, with a pitched roof usually the ridge. The eaves height is never higher than the building height. [Eaves, building height and plot](https://schaduwplan.nl/en/blog/toegestaan-volume-omgevingsplan/#what-is-the-permitted-volume)

**Bouwvlak (building plot)**

The area on the plot within which the main building may stand, as the omgevingsplan draws it on the map. Outside it a different, usually stricter regime applies. [Eaves, building height and plot](https://schaduwplan.nl/en/blog/toegestaan-volume-omgevingsplan/#what-is-the-permitted-volume)

**Omgevingsplan (municipal environment plan)**

The single plan in which the municipal council sets the rules for its whole territory (article 2.4 of the Environment and Planning Act). Since 1 January 2024 it succeeds the zoning plans; those sit in its temporary part until they are converted. [Where to find the omgevingsplan](https://schaduwplan.nl/en/blog/toegestaan-volume-omgevingsplan/#omgevingsplan-not-kadaster)

**Omgevingsvergunning (environmental permit)**

The municipality’s permission to build or renovate, applied for through the Omgevingsloket. If a plan needs a permit, building may only start once the permit has been granted. [Do I need a permit?](https://schaduwplan.nl/en/blog/uitbouw-omgevingsvergunning-bezonningsstudie/#do-i-need-a-permit)

**Vergunningvrij bouwen (permit-free building)**

Building without an environmental permit, because the plan falls within the rules of the Besluit bouwwerken leefomgeving and the omgevingsplan. Neighbour law still applies. [The limits of permit-free building](https://schaduwplan.nl/en/blog/uitbouw-omgevingsvergunning-bezonningsstudie/#permit-free-limits)

**Toegestaan volume (permitted volume)**

The building volume the omgevingsplan allows on a plot: the building plot with its maximum eaves height and building height, and not the complete permitted development, because permit-free building, in-plan deviation powers and custom rules are not in it. In Schaduwplan the measures are prefilled from Ruimtelijke Plannen where possible and you confirm or correct each value yourself, because the legal reading of the plan rules stays with you and your architect; the comparison is usable as evidence next to the norm test, not a pass or fail verdict of its own. [What the permitted volume does not say](https://schaduwplan.nl/en/blog/toegestaan-volume-omgevingsplan/#what-it-leaves-out)

**Dakopbouw (roof addition)**

An extra storey on an existing roof, often with a flat roof. Because it sits high, a roof addition can cast a lot of shadow on the neighbours’ windows and gardens. [When shadow is unlawful](https://schaduwplan.nl/en/blog/dakopbouw-buren-schaduw-onrechtmatig/)

**Uitbouw and aanbouw (extension and annex)**

An extension enlarges an existing room, usually at the back of the home; an annex is a new room built against the home. Whether it needs a permit depends on its position, depth and height. [Extensions and permits](https://schaduwplan.nl/en/blog/uitbouw-omgevingsvergunning-bezonningsstudie/)

**Dakkapel (dormer)**

A structure built out of a pitched roof, with its own window and a flat or sloping top. Whether it needs an environmental permit depends on its place on the roof and on the omgevingsplan. [Check your renovation](https://schaduwplan.nl/en/verbouwen/)

## Procedure and objection

The steps from application to court. This is explanation, not legal advice.

**Zienswijze (written view)**

A written response to a draft decision, such as a draft environmental permit, which the municipality makes available for inspection for six weeks. Anyone may submit one, also a person who is not an interested party. [Example of a zienswijze](https://schaduwplan.nl/en/blog/zienswijze-omgevingsvergunning-voorbeeld-bezonning/#what-is-a-formal-view)

**Regular and extended procedure**

The two ways a municipality prepares a permit. In the extended procedure a draft decision comes first, on which you can submit a zienswijze; in the regular procedure, the usual one for an extension, roof addition or dormer, an objection is possible after the decision. [Zienswijze or objection?](https://schaduwplan.nl/en/blog/zienswijze-omgevingsvergunning-voorbeeld-bezonning/#formal-view-or-objection)

**Bezwaar (objection)**

A letter in which an interested party asks the municipality to reconsider a decision it has taken, such as an environmental permit. In the regular procedure an objection is the step that comes before the court (article 7:1 Awb). [Object to a building plan](https://schaduwplan.nl/en/bezwaar-maken/)

**Bezwaartermijn (objection period)**

Six weeks (article 6:7 Awb). The period starts on the day after the municipality has made the decision known to the applicant (article 6:8 Awb); the notice in the municipal gazette comes on the same day or later. [The six weeks worked out](https://schaduwplan.nl/en/blog/bezwaar-tegen-bouwvergunning-buren-stappenplan/#the-six-week-deadline)

**Belanghebbende (interested party)**

A person whose interest is directly involved in a decision (article 1:2 Awb). That is almost always true for direct neighbours; only an interested party can object or appeal. [Who is in the procedure](https://schaduwplan.nl/en/blog/bezwaar-tegen-bouwvergunning-buren-stappenplan/#who-is-across-from-you)

**Beroep (appeal)**

The step to the district court, after the decision on the objection or, in the extended procedure, directly after the decision. The court’s ruling can be appealed to the Council of State. [The report in court](https://schaduwplan.nl/en/blog/bezonningsrapport-schaduwplan-rechtsgeldig/)

**Raad van State (Council of State)**

The Administrative Jurisdiction Division of the Council of State is the highest administrative court in building cases. In its ruling on Ootmarsum (2013) it annulled a zoning plan because a sunlight assessment was missing. [The rulings on sunlight](https://schaduwplan.nl/en/blog/dakopbouw-buren-schaduw-onrechtmatig/#administrative-law)

**Burenrecht (neighbour law, article 5:37 BW)**

The part of the Dutch Civil Code on nuisance between neighbours. Article 5:37 BW names depriving a neighbour of light as possible unlawful nuisance; the civil court weighs its nature, severity and duration case by case, and a valid permit does not protect the builder. [Neighbour law and sunlight](https://schaduwplan.nl/en/blog/bezonning-daglicht-burenrecht-regels-zonlicht/#neighbour-law)

## See it on your own address.

Open the 3D viewer, place a measurement point and see how many sun hours it gets on each reference day.

[Open the 3D viewer](https://schaduwplan.nl/en/app/)[Go to the FAQ](https://schaduwplan.nl/en/faq/)

## Related

- [Nederlandse versie](https://schaduwplan.nl/begrippen/)
