# Blog on sunlight, objections and renovating

> Articles about sunlight studies (bezonningsonderzoek), objecting to building permits, renovating and the TNO standard. Practical, grounded in open data.

Canonical: https://schaduwplan.nl/en/blog/
Last updated: 2026-10-12

- [What the zoning plan permits: the building plot explained](https://schaduwplan.nl/en/blog/toegestaan-volume-omgevingsplan/) - The omgevingsplan sets a building plot per parcel with a maximum eaves and building height: the permitted volume. Every Dutch address has one, but only newer plans publish it as data. What it leaves out: permit-free building, in-plan deviation powers and custom rules. (Standards & municipalities, 2026-09-09)
- [Sunlight and Dutch neighbour law: which rules apply](https://schaduwplan.nl/en/blog/bezonning-daglicht-burenrecht-regels-zonlicht/) - Three separate frameworks govern sunlight at a home. Sunlight access (the TNO standard) is a guideline, not a law. Daylight (Articles 4.146 and 4.147 of the Building Works Environment Decree) is the only one written into national law. Neighbour law (Article 5:37 of the Civil Code) governs unlawful nuisance. Window size counts for daylight, not for sunlight access. (Standards & municipalities, 2026-09-19)
- [Verifying a sunlight report: how to check it is genuine](https://schaduwplan.nl/en/blog/bezonningsrapport-verifieren/) - Every Schaduwplan PDF carries a unique SHA-256 hash that we publish at the moment of issue on schaduwplan.nl/verify. A judge, lawyer or neighbour can confirm in under thirty seconds that the file has not been altered since issue, without having to trust us. As far as we know, no other sunlight-study provider in the Netherlands does this. (How Schaduwplan works, 2026-11-17)
- [Drone, LiDAR or photogrammetry for height data](https://schaduwplan.nl/en/blog/hoogtedata-zelf-meten-drone-lidar-fotogrammetrie/) - When 3DBAG and AHN have not surveyed your home yet, you can commission height data yourself. Three routes are open: hire a surveying firm (price on quote, 1–2 weeks), fly a drone yourself and process it in WebODM or RealityCapture (from €750 in hardware, one weekend), or use a phone photogrammetry app for visualisation. Thresholds, rules (Open A1/A2/A3, Remote ID) and the GeoTIFF format Schaduwplan accepts. (Data sources, 2026-11-17)
- [AHN6 and the AHN height map: when will my home be measured?](https://schaduwplan.nl/en/blog/wat-is-ahn-wanneer-wordt-mijn-woning-ingemeten/) - AHN6 is the newest version of the AHN height map: a laser scan of the Netherlands from an aircraft. The first part, the north-east, came out on 13 October 2025; capture runs until the end of 2027. Here is how to see which AHN version covers your address, when your home is due and how Schaduwplan reads a roof height from it. (Data sources, 2026-11-17)
- [Why Schaduwplan has no subscription: € 49, one time](https://schaduwplan.nl/en/blog/waarom-schaduwplan-geen-abonnement/) - Schaduwplan charges € 49 per report, one time. No subscription, no trial. Most people need one report per permit procedure: once every 5 to 10 years for homeowners. A consumer subscription of € 2.49 per 90 days costs € 50.62 over 5 years, while Schaduwplan stays a single, clear transaction. (How Schaduwplan works, 2026-09-19)
- [Sunlight study for a permit: SketchUp to auditable PDF](https://schaduwplan.nl/en/blog/bezonningsstudie-architecten-sketchup-pdf/) - A manual sunlight study in SketchUp or Revit takes 4 to 16 hours of architect time per project. With Schaduwplan you generate an auditable PDF report in 5 minutes from 3DBAG, BAG and AHN4, tested against the light TNO, strict TNO or municipal standards. (How Schaduwplan works, 2026-09-19)
- [How the sun moves across your garden, by season](https://schaduwplan.nl/en/blog/hoeveel-zon-heeft-mijn-tuin/) - In the Netherlands the sun moves from east through south to west and stands due south around midday. Only its height changes: on 21 June it reaches 61 degrees in Amsterdam, on 21 December 14 degrees. This article gives the sun position per reference day and shows how much of that sun your garden actually keeps. (Technology & data, 2026-11-17)
- [Is a sunlight study admissible in an objection or in court?](https://schaduwplan.nl/en/blog/bezonningsrapport-schaduwplan-rechtsgeldig/) - A Schaduwplan sunlight report is indicative and admissible in court. For formal views (zienswijzen), objection procedures and civil neighbour-law cases it is sufficient in almost all situations, because it uses the same 3DBAG, BAG and AHN4 sources that professional firms and the Administrative Jurisdiction Division of the Council of State rely on. For formal administrative appeal proceedings we recommend verification by a sworn expert. (How Schaduwplan works, 2026-09-19)
- [Example zienswijze on an environmental permit](https://schaduwplan.nl/en/blog/zienswijze-omgevingsvergunning-voorbeeld-bezonning/) - A zienswijze is your written response to a draft environmental permit during its six-week public-review window. This template combines the correct legal form under Article 3:16 of the General Administrative Law Act (Awb) with hard sunlight figures from 3DBAG and AHN4: three example paragraphs with placeholders for sun hours, measurement points and test dates from your report, plus guidance on when a zienswijze rather than a formal objection is the right route. (Objections & legal, 2026-11-17)
- [What does a sunlight study cost in 2026? A price comparison](https://schaduwplan.nl/en/blog/wat-kost-bezonningsonderzoek-2026/) - A sunlight study in the Netherlands costs € 39 to € 5,000 in the Netherlands. That is the gap between an automated self-service report and a large engineering firm with a sworn expert. This guide sets four price tiers side by side, from self-service tools to large engineering firms, with honest trade-offs in turnaround, legal weight and iteration. (Standards & municipalities, 2026-09-19)
- [Extension permit: does it need a sunlight study?](https://schaduwplan.nl/en/blog/uitbouw-omgevingsvergunning-bezonningsstudie/) - A rear extension is often permit-free up to 2.5 m deep and below the eaves line of the main house. Above that you need an environmental permit, and municipalities such as The Hague and Rotterdam almost always require a sunlight study with it. Substantiating this up front prevents neighbour objections and redesign costs. (Renovating, 2026-09-19)
- [Which data does Schaduwplan use? 3DBAG, BAG, AHN4 and PDOK](https://schaduwplan.nl/en/blog/welke-data-schaduwplan-3dbag-ahn4-bag/) - Schaduwplan runs on four open government sources: BAG, PDOK, 3DBAG and AHN. BAG and PDOK supply addresses and building outlines, 3DBAG the building models and AHN the laser heights, in three versions: AHN4, AHN5 and AHN6. For buildings 3DBAG still lacks, Schaduwplan calculates the roof itself on the newest AHN6 scan, with roofer. Vertical accuracy of AHN: 5 cm. (Technology & data, 2026-11-17)
- [The TNO sunlight standard: light and strict variants](https://schaduwplan.nl/en/blog/tno-bezonningsnorm-uitgelegd/) - The TNO sunlight standard is the Dutch guideline for how much direct sun a home should get at minimum. The measurement point is in the living room, 75 cm above the floor. The light standard asks for 2 possible sun hours a day from 19 February to 21 October; the strict standard 3 sun hours from 21 January to 22 November. It is not a legal requirement: the municipality chooses which one it applies, and The Hague, Rotterdam, Eindhoven and Krimpen have their own variants. (Standards & municipalities, 2026-09-19)
- [Neighbour's roof addition: when is the shadow unlawful?](https://schaduwplan.nl/en/blog/dakopbouw-buren-schaduw-onrechtmatig/) - Shadow from a roof addition is legally unlawful when the loss of sunlight materially harms normal enjoyment of the home. In one case, on 17 January 2024, the District Court of The Hague ordered the demolition of a roof addition that reduced the sunlight on the neighbours’ rear facade by 75 to 80%, even with a valid permit, under Article 5:37 and Article 6:162 of the Civil Code. (Objections & legal, 2026-11-17)
- [From address to sunlight report in 5 minutes](https://schaduwplan.nl/en/blog/hoe-werkt-schaduwplan/) - This is how Schaduwplan works, from address to report. You see what you enter, which open government data (3DBAG, BAG, AHN4) sits underneath, what the PDF report contains and when the report is legally sufficient. From address to sunlight report in about five minutes — for € 49 instead of a consultancy’s quote. (How Schaduwplan works, 2026-11-17)
- [Objecting to a neighbour's building permit: the steps](https://schaduwplan.nl/en/blog/bezwaar-tegen-bouwvergunning-buren-stappenplan/) - An objection based on gut feeling rarely succeeds. This step-by-step plan shows how, within six weeks, you use 3DBAG, BAG and AHN4 to quantify exactly how many sun hours you lose — the evidence on which the District Court of The Hague ordered a roof addition demolished at 75 to 80% sunlight loss on 17 January 2024. (Objections & legal, 2026-11-17)

## Related

- [Nederlandse versie](https://schaduwplan.nl/blog/)
