# A sunlight report for your permit

> Planning an extension or roof addition? See instantly what shadow you cast on your own garden and your neighbours' — before you submit the permit application.

Canonical: https://schaduwplan.nl/en/verbouwen/
Last updated: 2026-10-16

Before you submit your permit

## Prevent objections. Strengthen your permit.

An extension, roof addition or annex affects more than your own garden — it affects your neighbours too. Test it first, adjust the design, and submit a well-supported permit (omgevingsvergunning) application. Fewer surprises, less delay.

You do not need a construction drawing to start. Sketch the design directly in the viewer.

What makes your design stronger

- 01**Your own garden first** — see whether it keeps its afternoon sun once the addition is in place.
- 02**Neighbour impact** — know in advance what shadow you cast on the terrace or windows next door.
- 03**A stronger permit** — a sunlight report as an attachment addresses the most common objections (bezwaar) up front.

Tip: the fewer afternoon sun-hours you take from your neighbours on the TNO reference days, the smaller the chance of a successful objection — municipalities (gemeente) and judges weigh impact, not principle.

Why Schaduwplan

## A better permit application, in less time.

We help you design with less shadow — and prove that your design is reasonable.

01

Iterate

### Play with height and form

Lower the addition by 20 cm, shift the extension a metre, rotate the gable roof — and see immediately what it does to the shadow. No need to commission a consultancy.

02

Neighbour peace

### Show the impact proactively

An open conversation based on data prevents escalation. Send the PDF to your neighbours together with your permit application — often that is enough to prevent an objection.

03

Permit

### A stronger application to the municipality

Many municipalities ask for a sunlight justification for permits that touch threshold values. Include it by default, and you get fewer follow-up questions.

How it works

## From first sketch to submitted permit.

You do not need to know any 3D software. Sketching works with drag-and-drop blocks, and the calculations happen automatically.

1. 01
   ### Start with your own address
   We load your home and all surrounding buildings from 3DBAG. Your home is marked as the subject automatically.
2. 02
   ### Sketch your renovation
   Choose an extension, roof addition, annex or free-standing volume. Type in dimensions (L × W × H), then rotate or move it until it fits.
3. 03
   ### Evaluate the impact
   Place measurement points on your terrace and on your neighbours' terrace. Schaduwplan calculates how many hours of sun each point gets per day — current situation versus design.
4. 04
   ### Adjust. Repeat. Download.
   Is the impact too large? Adjust the height and recalculate. Happy with it? Download the report as an attachment to your permit application.

What is in your report

## Everything the municipality usually asks for separately.

North arrow, scale bar, before-and-after diagrams on every TNO reference day in your analysis, a measurement-point table with pass/fail, a methodological basis, and source attribution. Ready for the permit desk (omgevingsloket).

- Before/after on every TNO reference day
- Height measurement via AHN (centimetre-accurate)
- TNO Light + Strict norm
- Municipal norms where applicable
- Before/after comparison per measurement point
- Source attribution on the cover and in the sources appendix

Possibly covered by your home legal-expenses insurance.

Home legal-expenses insurance can cover sunlight reports in disputes about building permits or neighbour law. Check your policy for "deskundigenrapport" (expert report) or "bouwtechnisch advies" (technical building advice) — or email us and we will help.

[More on reimbursement in the FAQ →](https://schaduwplan.nl/en/faq/#verzekering)

Report

€49 one-off per renovation

One report for your permit application.

- TNO Light + Strict norm
- Municipal norms where applicable
- Before/after comparison per measurement point
- North arrow, scale and source attribution
- PDF ready to use as an attachment

[Start sketching](https://schaduwplan.nl/en/app/)[View the pricing](https://schaduwplan.nl/en/prijzen/)

Questions about renovating

## On design, neighbours and permits.

[To the full FAQ](https://schaduwplan.nl/en/faq/)

### Which types of renovation can I model?

Rectangular volumes, extensions, roof additions, annexes, dormers with a flat or a pitched roof, free-standing sheds, carports, pergolas, walls and fences. Trees, conifers and tall shrubs as well, because planting casts shadow that counts.

### Does my architect have to do this, or can I do it myself?

Both work. Many homeowners sketch the first design themselves and send the report to their architect as input. Architects can also use Schaduwplan for their own clients — €49 one-off per report, no subscription.

### My contractor says a sunlight study is only needed for large projects.

Formally that is correct: it is only mandatory for specific applications. But informally, every municipality welcomes a well-supported application — it saves them work too. And handing it to your neighbours up front removes the biggest risk of an objection.

### Can I use the report as evidence in future disputes?

Yes. Keep the PDF and the original scenario file. If a dispute arises later (for example over a modified design), you have a time-stamped reference model.

### What if I change the design later?

Adjust the design in the 3D viewer and order a new report (€49). No subscription, so only when you need a new version.

## Related

- [Nederlandse versie](https://schaduwplan.nl/verbouwen/)
